《换热站(热力站)施工组织设计(施工方案)》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库。
1、..-2015年XX市热力XX工程热力站施工组织设计工程集团XX..word.zl-..-年月日目录一、工程概况----------------------------------------二、施工技术与方案----------------------------------1,施工规及验收依据·······································2,换热机组安装方案·········································3,泵类安装···························
2、······················4,水箱的制作与安装·········································5,管道及附件安装方案·······································6,阀门、压力仪表安装·······································7,配电柜安装···············································8,除锈防腐·······································
3、··········9,试压·····················································10,保温····················································11,系统调试················································三、施工组织方案与措施------------------------------1,开工前需要做好的施工准备工作·····························2,工程管理人
4、员配置及劳动力方案·····························3,拟投入的机械、设备及进场方案4,质量方案与保证措施·······································5,进度方案及保证措施·······································..word.zl-..-6,平安文明施工管理·········································2015年XX市热力XX供热工程热力站施工组织设计一、工程概况本工程为2015年XX市热力XX供热工程热力站
5、,施工地点位于西青区中北镇,供热主体为澜湾广场和澜湾花园,分一期和二期工程两局部,工程容包括设计安装全自动换热机组3套,一期2套换热机组,设计热负荷为Q6098kw,二期1套机组设计热负荷为Q480kw;管道安装包含螺旋焊接钢管ø3257/50米,ø2736/110米,ø2196/10米,直缝焊接钢管DN150/140米,DN125/10米,DN100/100米,DN80~DN25/107米,管件安装包含阀门、弯头、变径等;设备系统其他安装包含循坏水泵2台,补水泵2台,除污器3台,221.5水箱1个等;以及设备相关电气、仪表系统的所有安装
6、。二、施工技术与方案1,施工规及验收依据?板式换热器?GB/T16409..word.zl-..-?城市热力网设计规?CJJ34-2002?工艺设备及管道绝热工程设计规?GB50264-1997?输送流体用无缝钢管?GB/T8163-1999?现场设备、工业管道焊接工程施工及验收规?GB50236-98?工业金属管道工程施工及验收规?GB50235-1997?工业设备及管道绝热工程机验收规?GBJ126-1989?工业自动化仪表工程施工及验收规?GB93-86?室热力管道支吊架?94R402?压缩机、风机、泵安装工程施工及验收规?GB50
7、275-981,换热机组安装方案〔1〕、换热机组到货验收、设备根底验收:设备到货后的验收:对板换进展外观检查应做到如下标准:螺栓无松动、棱角无碰撞、板换进出口封闭严密、板换换热片排列整齐、胶垫无外露、板换型号与图纸要求符合、其他资料齐备(出厂合格证、技术参数等),换热片前后尺寸一致,无异常变形等。设备吊运就位前的根底验收:根据图纸确定根底位置,测定标高,使用侧尺测定地脚螺栓孔的深度及长宽。根底外表清理干净,地脚螺栓孔无积水杂物,根底外观无裂纹空洞等缺陷。为使二次灌浆层与根底能很好的结合,根底外表铲麻。〔2〕、设备吊运及就位:设备吊运通道及
8、吊运方案根据现场实际情况而定,但需得到建立单位和监理单位现场管理人员的同意。机组吊上根底后,在机组四角用四台满足要求的千斤顶将机组提升,进展平面位置找正。待机组中心与根底中心线重合,放下机组。