欢迎来到天天文库
浏览记录
ID:10244146
大小:210.00 KB
页数:30页
时间:2018-06-13
《软件园工程脚手架工程施工方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库。
1、青岛市南软件园G-1、G-2工程脚手架工程施工方案青岛市南软件园G-1、G-2工程脚手架工程施工方案编制:审核:批准:青岛建设集团华友建设发展有限公司二○○四年七月第29页29-青岛市南软件园G-1、G-2工程脚手架工程施工方案目次1.工程概况····································································22.方案选择····································································23.施工工艺··········
2、··························································23.1脚手架搭设工艺3.2脚手架拆除工艺4.施工方法····································································34.1脚手架基础4.2悬挑槽钢的支设4.3脚手架搭设4.4脚手架拆除5.主要资源需求计划·························································5第29页29-青岛市南软件园G-1、G-2工程脚手架
3、工程施工方案6.施工要求及安全技术措施·················································56.1施工要求6.2安全技术措施7.编制依据···································································108.外脚手架计算书···························································139.卸料钢平台方案···········································
4、················221.工程概况青岛市南软件园G-1、G-2工程G-1地下2层,地上裙房2层,主楼22层;第29页29-青岛市南软件园G-1、G-2工程脚手架工程施工方案G-2地下2层,地上裙房2层,主楼20层;建筑高度G-1办公楼80.5m,G-2办公楼74.4m,地下一层及地上一层层高为4.5米,二层及其以上层高为3.3米。框架的抗震等级为三级,核心筒的抗震等级为二级,地下室无上部主楼部分框架及砼墙的抗震等级为三级,地下二层至地上三层为底部加强部位,四层及以上为非加强部位。抗震设防烈度为六度。2.方案选择2.1本工程地下两层,进行地下二层
5、施工时,沿负二层外墙搭设落地式双排钢管扣件式脚手架,地下室外墙防水施工完毕后即拆除。详见附图一。2.21~6层采用落地式双排钢管扣件式脚手架,高度为21m,详见附图二;7层及其以上采用悬挑双排钢管扣件式脚手架,悬挑梁选用18#槽钢,每5层悬挑一次,共悬挑3次,每一悬挑脚手架的高度为16.5m。3.工艺流程3.1脚手架搭设工艺(1)地下室及1~6层落地式脚手架:准备工作→立杆底座→立杆→横杆→剪刀撑→接头锁紧→安装连墙件→铺设脚手板→立挂安全网→上层立杆→立杆连接销→横杆;(2)7层及其以上悬挑式脚手架:准备工作→悬挑槽钢的架设→立杆→横杆→剪刀撑→接头锁紧→
6、安装连墙件→铺设脚手板→立挂安全网→上层立杆→立杆连接销→横杆。3.2脚手架拆除工艺密目网→横杆→立杆→剪刀撑→连墙件4.施工方法4.1脚手架基础地下室及1~6层外墙脚手架采用落地式双排脚手架,脚手架的地基应夯实,且有足够的承载力。脚手架立杆设钢底座,底座下为50mm厚的通长木垫板,底座和垫板应准确地放在立杆的定位线上。第29页29-青岛市南软件园G-1、G-2工程脚手架工程施工方案4.2悬挑槽钢的支设7层及其以上采用悬挑式脚手架,每5层悬挑1次。悬挑结构分为两种情况:南北立面为18#槽钢及14#钢丝绳斜拉索,东西立面为18#槽钢及Φ48钢管斜撑。用预埋在楼
7、板中的Φ20及Φ16Ω型圆钢环将槽钢卡住,并用硬木楔将槽钢楔紧;在外挑槽钢上与立杆对应位置处各焊1根Φ25mm、高120mm的钢筋以固定立杆,斜拉索及斜撑对应位置各焊1根Φ25mm、长120mm的钢筋以固定斜撑。详见附图三。4.3脚手架搭设4.3.1脚手架钢管的搭设外脚手架采用双排Φ48×3.5mm钢管搭设,立杆的横距0.9m、纵距1.5m、横杆的步距1.8m、内立杆离墙300mm。脚手架必须设置纵、横向扫地杆。纵向扫地杆应采用直角扣件固定在距底座上皮不大于200mm处的立杆上。横向扫地杆用直角扣件固定在紧靠纵向扫地杆下方的立杆上。立杆与大横杆的交点处设置小
8、横杆,小横杆应紧靠立杆用扣件与大横杆扣牢。在脚手架外
此文档下载收益归作者所有